Name:Air generator
Model:EJ-A20
1) It can replace traditional high-pressure air cylinders and enable laboratory instrumentation;
2) It uses an 8L magnesium-aluminum alloy gas storage tank, which has high pressure resistance, does not rust, and has a large gas storage capacity. The generator starts and stops less often, which greatly extends the service life of the compressor;
3) The purifier uses PC polycarbonate pipes, which are resistant to high pressure, reagents, impact, not easy to break, and have high strength;
4) The gas system has three levels of purification and two levels of voltage stabilization output;
5) Three-level automatic protection of overpressure, overcurrent and overheating;
6) Automatic drainage, effectively extending the service life of the instrument;
30L large-capacity stainless steel gas storage tank, which can provide air source for 10 gas chromatographs at the same time
Output flow (L/min): 0~20
Output pressure: 0~0.4Mpa (Adjustable)
Power supply: AC220V±10%
Rated power: 1000W
Dimensions: 340*600*740mm
| Model | EJ-A3 | EJ-A5 | EJ-A10 | EJ-A20 | EJ-A30 |
|---|---|---|---|---|---|
| Output flow (L/min) | 0~3 | 0~5 | 0~10 | 0~20 | 0~30 |
| Output pressure | 0~0.4Mpa (Adjustable) | ||||
| Power supply | AC220V±10% | ||||
| Rated power | 150W | 1000W | |||
| Dimensions/weight | 455*260*380mm/26Kg | 340*600*740mm | |||
Yes, all our dry cabinets and environmental chambers are fully customizable based on your technical specifications, capacity, materials (e.g., SUS304), and functional requirements (e.g., N₂ purge, heating, data logging).
• Standard models: 5–10 working days
• Customized configurations: 15–30 working days
Lead times may vary slightly based on order volume and component availability.
We offer flexible Incoterms® 2020 options to suit your logistics needs:
Note: DDU is no longer used in Incoterms® 2020; DAP is the current standard.
Shipping costs depend on product dimensions, weight, destination, and chosen transport method (sea, air, rail, or express). Import duties, VAT, GST, or other local taxes are typically the buyer’s responsibility unless DDP terms are selected. A detailed breakdown of all costs will be included in your official quotation.
Yes. We regularly export to clients worldwide and are experienced in handling international documentation, customs compliance, and global logistics coordination for industrial equipment.
Region
Users
Certification